Project Overview

Precast Factory

11,741 m2 precast factory, the structure was composed of precast columns, precast roof i-beams, and steel z-shape purlins as well as girts, spans was 20.1 m + 16.1 + 20.1 m, eave height 15 m, and height at ridge was 16.2m, bay spacing was 9.45m and the steel

crane runway beams was steel, overhead cranes had a capacity of 15, and 20 Tons. Roof and walls was composed of 0.5 mm single skin sheeting. The structure was designed to be de-assembled and relocated along with the foundation, columns were bolted to the foundation.

Key Project Information Details

  • 2024
  • Confidential.
  • Green Dome.
  • Umluj - Saudi Arabia.
  • 2,114,200 SR.
  • Four Month..